An extensive amount of construction records

【Construction record】Geodrain method

  • Case 1
ObjectiveTo reduce cost by replacing the sand with the horizontal drain
LocationJapan (Nagano)
PurposeRoad
Year2020〜2021
Scale7,440㎡
Adopted drain materialGeodrain + SB drain
  • Case 2
ObjectiveTo compensate insufficient drainage capability of the sand blanket
LocationMyanmar (Thilawa)
PurposePort
Year2016
Scale200,000㎡
Adopted drain materialGeodrain + SB drain
  • Case 3
ObjectiveTo reduce the cost of replacing the sand with the horizontal drain
LocationJapan (Tokyo)
PurposeResidential land
Year2011
Scale10,000㎡
Adopted drain materialGeodrain + SB drain
  • Case 4
ObjectiveTo resolve the case in which the sand acquisition is difficult
LocationVietnam (Ho Chi Minh)
PurposeHighway
Year2006
Scale338,000㎡
Adopted drain materialGeodrain + SB drain

Download Geodrain method construction record

【Construction record】Geodrain SPD method

  • Case 1
ObjectiveTo shorten construction period
LocationJapan (Yamaguchi)
PurposeWharf
Year2020〜2021
Scale48,000㎡
Adopted drain materialGeodrain + SB drain
  • Case 2
ObjectiveTo shorten construction period and resolve the issue of damaging substances remaining in the ground
LocationJapan (Kanagawa)
PurposeResearch facility
Year2019
Scale33,800㎡
Adopted drain materialNonaldrain + SB drain
  • Case 3
ObjectiveTo prevent slip failures of preloading
LocationIndonesia (Central Java)
PurposeThermal power plant
Year2016~2017
Scale100,000㎡
Adopted drain materialGeodrain + SB drain
  • Case 4
ObjectiveTo resolve the shortage of embankment fill and the restriction on the dump trucks
To resolve the issue of damaging substances remaining in the ground
LocationJapan (Kanagawa)
PurposeCommercial facility (Shopping complex)
Year2013~2014
Scale64,000㎡
Adopted drain materialNonaldrain + SB drain
  • Case 5
ObjectiveTo reduce cost (Countermeasure for slip failures of preloading embankment slides)
To resolve the issue of damaging substances remaining in the ground
LocationJapan (Saitama)
PurposeResidential land
Year2011~2012
Scale9,900㎡
Adopted drain materialNonaldrain + SB drain
  • Case 6
ObjectiveTo reduce the amount of the sand and soil to be loaded
LocationJapan (Ibaraki)
PurposeRiver (Waterway)
Year2007
Scale7,800㎡
Adopted drain materialGeodrain + SB drain

Download Geodrain SPD method construction record

【Construction record】Biodegradable drains

  • Case 1
ObjectiveTo prevent leaving damaging substances in the ground
LocationJapan (Ibaraki)
PurposePurpose Urban redevelopment project
Year2021
Scale950㎡
Adopted methodGeodrain method
Adopted drain materialNonaldrain + BSB drain
  • Case 1
ObjectiveTo use plant-based product
Image improvement
LocationJapan (Kanagawa)
PurposeLand readjustment project (Land rezoning project)
Year2016~2017
Scale27,000㎡
Adopted methodGeodrain SPD method
Adopted drain materialNonaldrain + BSB drain
  • Case 3[Earthquake recovery project]
ObjectiveTo prevent interfering subsequent constructions
To prevent leaving damaging substances in the ground
LocationJapan (Miyagi)
PurposeResidential land construction
Year2014~2017
Scale120,000㎡
Adopted methodGeodrain method
Adopted drain materialNonaldrain + BSB drain
  • Case 4
ObjectiveTo prevent interfering subsequent constructions
LocationJapan (Tokyo)
PurposeContainer yard
Year2005~2006
Scale75,000㎡
Adopted methodGeodrain method
Adopted drain materialNonaldrain + BSB drain